Digital Energy

Solana Validator Economics: Summary

The main figures from the full brief on one page. Section numbers point to where each one is computed.

Digital Energy, LLC · November 7, 2026 · $105/SOL modeling basis · 5% inflation / 10% MEV commission unless stated · Working analysis, not financial advice. Full brief.


Breakeven: delegated stake required

CaseSOL
After Alpenglow (active since October 21, 2026), $30,000 hosting, any slot speed (§8)65,078
… at a measured $21,636 hosting contract56,160
… measured on the October 2026 settlement record, $30,000 / $21,636 (§8)~70–76K / ~60–65K
Before Alpenglow, 400ms reference (§10)76,528
Per-slot voting at 200ms, until October 21 (§8)~113,000–121,000
0% base commission instead of 5% (§4)111,166
Inflation commission only, the figure that circulates as folk math (§11)245,609

Revenue and cost

LinePer SOL of stake, per yearShare
Inflation commission (5% of ~5.57% gross yield)0.278%~30%
Block rewards (priority fees, 100% to the validator)0.600%~64%
MEV tips at the 10% cap~0.015%~2%
Core revenue rate0.893%
Annual cost after AlpenglowSOL
Validator Admission Ticket, 0.8 SOL/epoch at 200ms (~267 at the achieved ~218ms)296
Hosting, mainnet + failover, $30,000286
Total582

Each $1,000 a year of hosting moves breakeven by about 1,066 SOL. Hosting runs from 60,538 to 87,188 SOL of breakeven across $15,000–$40,000 contracts at the 400ms reference (49,097 to 75,733 after Alpenglow), so readers should use their own invoice (§6).

Measured, not modeled

What moves the number

The SFDP after November 6

CaseExternal stakeSFDPTotal
New member at breakeven, 50% match43,38521,69365,078
Full match100,00050,000150,000
Incumbent at 205,000 external, old rules205,00084,540289,540
… retained under the new rules / retired205,00050,000 / 0255,000 / 205,000

At most 100 validators, at most 50,000 SOL each, twelve-month terms, graduation above 300,000 SOL of external stake. At breakeven the program carries a third of a member's book for one year. An incumbent allocation of 84,540 SOL earns about 755 SOL a year, 1.3× the full post-Alpenglow cost base. The program's total footprint is capped at 5.0M SOL, against something like 26M placed before (§13). How residual and match combine is not stated in the rules; this summary uses the larger of the two, capped at 50,000.

Methods and weak points are in the full brief. Corrections are welcome and are credited by name.